Demolition Work Of Distressed / Dangerous Portion of the Collapsed Vivekandand Road (Posta) Flyover in North Kolkata in 3 Phases

Engineering
Image12
Image13
Image12
Image11
Image10
Image9
Image8
Image7
Image6
Image5
Image4
Image3
Image2

Fagioli India is awarded the contract for dismantling of DANGEROUS PORTION OF THE COLLAPSED VIVEKANDAND ROAD (POSTA) FLYOVER IN NORTH KOLKATA in 03 phase by Fagioli strand jack system.

Phase 01: 12 Nos. Bridge spans of 40 Meter long with weight of approx.285 tons each span.

Phase 02:  20 Nos. Bridge spans of 40 Meter long with weight of approx.285 tons each span.

Phase 03:  34 Nos. Bridge spans of 40 Meter long with weight of approx.285 tons each span.

Currently Phase 01 has been completed and Phase 02 in progress

The scope of the work in this contract included to supply Fagioli Strand Jacks, respective PPU’s , different types of support columns as per required height for each pier , two types of Jack support beams with anchor rod connection , base frame under the support columns and Lifting beams with anchors to dismantle the bridge spans.
Each bridge span weight is approx.285 Tons.   
Fagioli used 4 nos.180 Ton capacity strand jacks with anchor connected to the lifting beam at the bottom of bridge spans.
The overall lowering responsibility is taken by Fagioli INDIA.

Detailed Engineering has been done for each spans as every spans having a different height variations and many obstacles for the lowering of the bridge. Fagioli India has taken at most safety Precautions with proper planning in cooperation with high officials of the city government and police as Bridge dismantling work is going on in fully crowded area in the center of the city.